9.2 Installation

continued from 9.1

At the ridge, cut enough of the shingle off to ensure that the top of the shingle is flush with the edge of the ridge. Continue to install courses until the cap shingle covers the field shingle in such a way that no headlap portion of the shingle is visible, or that the maximum exposure of the top course is the same as the exposure of the rest of the roof (refer to detail 005).

Detail 005: Ridge Detail

Important Reminder:
Frequently stop to examine your work from ground level to ensure that optimum visual appeal is being achieved. Exposures are 6", and 7" (15 cm, and 18 cm) measured from the bottom of the shingle.